Hunter Hill House - Checklist

Updated: Dec 31, 2021

I am starting in earnest to prepare for building our Sullivan Countly, NY country home in the Catskills. It is my intention to document the process for my own reference and to benefit others with similiar ambitions.


There are a number of areas I am focused on:


Design Criteria

Many of these are going to come from Passive House sustainability requirements (see below), but below is some information from the Town of Neversink:

For Prefab Metal Buildings movement of structural members is a big concern. The International Residential Code covers these requirements:


Sustainability

Currently, I am targeting a Passive House certified building through PHIUS, one of two US-based Passive House organizations. To be Passive House certified, a house must meet the criteria in the PHIUS+ 2018 Passive Building Standard Certification Guidebook. and also the criteria for New York Sullivan County EPA Energy Star Certified Homes, EPA Indoor AirPLUS Qualified Home, and DOE Zero Energy Ready Homes.


The below are basic principles from the PHIUS website:


Passive building comprises a set of design principles used to attain a quantifiable and rigorous level of energy efficiency within a specific quantifiable comfort level. "Optimize your gains and losses" based on climate summarizes the approach. To that end, a passive building is designed and built in accordance with these five building-science principles:


  • Employs continuous insulation throughout its entire envelope without any thermal bridging.

  • The building envelope is extremely airtight, preventing infiltration of outside air and loss of conditioned air.

  • Employs high-performance windows (double or triple-paned windows depending on climate and building type) and doors - solar gain is managed to exploit the sun's energy for heating purposes in the heating season and to minimize overheating during the cooling season.

  • Uses some form of balanced heat- and moisture-recovery ventilation.

  • Uses a minimal space conditioning system.

Building Department Approvals

For the Permit application we need:

  • 2 sets of stamped Construction Plans

  • Truss Package - Fire Department Placarding (?)

  • Approved Septic Design NYS Stamped

  • Foundation Plan NYS Stamped

  • Electrician - Sullivan County License only - Copy of License

  • Third-Party Inspections for LP Gas and Electrical

  • NYS Workman's Compensation Blanket Insurance Policy from all contractors

For Energy Code we need:

  • RESCHECK Compliance Report

  • Air Exchange System Design, Model Installation Manual

  • Heat Load Calculations, Heating Unit Model, Installation Manual

  • Cooling Load Calculations, Cooling Unit Model, Installation Manual

  • Basement Insulation Code Compliant

  • House Blower Door Test, 3rd Party Contractor Copy of Certifications

  • Duct Blasting Test, 3rd Party Contractor Copy of Certifications

Cost Estimates

Cost Estimates will be based on the following building components:

  • Septic System (+/- $15,000) Shallow Absorption Trench System for a three-bedroom house

  • Well (+/- $15,000)

  • Foundation There is bedrock 2 to 3 feet below the surface of the property, so the current plan is to build foundation walls anchored directly to the bedrock, with fill and thick insulation to create a slab on grade. The slab will actually be above grade so there will be minimal excavation - primarily for the foundation walls.

    • For the Foundation walls I am considering ICF or Nexcem

    • For the underslab insulation I am considering Perlite as part of the system.

  • Core and Shell The Core and Shell is planned to be a prefabricated metal building with insulated metal panels. The "Basis of Design" is a Metallic Building Systems Gable Symmetrical Structure. I was originally interested in Centria Versapanels but may go with MetlSpan. A 4" Insulated Metal Panel (IMP) gives an R-Value of 31. Exhaustive MetlSpan details are here.

  • Windows & Doors Phius has a list of windows & Doors that meet their requirements for Zone 6.






Getting Started: Summer of 2021


Given the COVID-inspired building boom and the supply chain issues for materials, we are going to delay construction until Spring of 2022. Hopefully, contractors will be more responsive and available then. In the meantime we have a few short-term objectives for this summer:

  • Temporary Power

  • A level 2 charging station for our electric car

  • A 20-foot shipping container for on-site storage

  • A topographical survey so we can locate the house and septic system and file with the town

15 views0 comments